Automatic number/date change between sheets?
I need 52 sheets (one for each week of the year).
At the top of sheet 1 I need it to say "Week 1" and "week ending ...".
At the top of sheet 2 I need it to say "Week 2" and "week ending ..." (seven days after the week 1 date)
Is there a way to do this automatically?
Mac Studio, macOS 14.5